Impulse Hydro Turbine for Hydro Power Plant

Output Type: AC Three Phase
Size: Various
Type: Vertical & Horizontal
Bearing Support: Umbrella & Hanging
Speed: Medium Speed
Bearing Number: 3
Manufacturer/Factory, Trading Company, Group Corporation
Gold Member Since 2012

Suppliers with verified business licenses

Shandong, China
to see all verified strength labels (27)

Basic Info.

Model NO.
Various
Standard
Standard
Head
50 to 170m
Range of Supply
Turbine-Generator Set and Parts
Maintenance
Available Upon Request
Commissioning
Available Upon Request
Period of Warranty
3 Years
Transport Package
in Bulk
Trademark
Runh
Origin
Shandong Province
Production Capacity
500 Units Per Year

Product Description

Francis Turbine, as the most commonly used turbine in hydro power generation, has following technical features, compared with other models of hydro turbine.

1. The optimal model for low flow-head ratio: impulse hydro turbine is the optimal choice for power plant taking advantage of small water flow from high elevation.

2. Wide average efficiency: impulse hydro turbine has high efficiency on average. e.g Pelton turbine is able to perform with average efficiency of 91% in the load range of 30 to 110%.

3. Minimal requirement of civil work: in many case where impulse hydro turbine is used to generate power from water falling from high head, no dam or draft pipe on downstream is required, causing minimal negative environmental impact.

Scope of supply of Runh Power: Hydro-turbine and generator unit.

Impulse Hydro Turbine for Hydro Power Plant

Technical parameters of Impulse turbine provided by Runh Power:

1.Head: 260 to 725 meters (turbine with head higher than 725 meters can be customize-made)
2.Flow: no more than 2.03 m3/s 
3.Capacity of generator : 20 to 6700 KV
4.Output of the unit :18.0 to 6300 KW

Following is a table of parameter of part of Runh Power's Francis turbine: 
(Complete catalog of inclined jet turbine is available upon your request.)

 
model turbine generator output of the unit
(KW)
governor valve
head
(m)
Flow
(m3/s)
Output
 (kv)
speed 
(r/min)
model capacity
(kW)
CJA237/475-W-70/1X4.5 260 0.108 266 1000 SFW200-6/650 200 210.8 CJWT-BWT-3000 Φ300
295 0.115 280 SFW250-6/740 250 261.8
345 0.125 352 SFW320-6/740 320 330.8
400 0.135 433 SFW400-6/740 400 407.0
450 0.143 503 SFW500-8/850 500 473.4
CJA237/475-W-70/1X5.5 260 0.165 348 1000 SFW320-6/740 320 326.4 CJWT-1-BWT-3000 Φ300
280 0.171 413 SFW400-6/850 400 388.2
300 0.177 435 SFW400-6/850 400 408.8
320 0.183 479 SFW400-6/850 400 450.3
340 0.188 501 SFW500-6/850 500 472.4
350 0.191 520 SFW500-6/850 500 490.4
380 0.200 543 SFW500-6/850 500 512.1
421 0.207 611 SFW630-6/990 500 576.2
430 0.212 685 SFW630-6/990 630 647.3
70.3 0.82 721 SFW500-6/990 630 681.3
 
 
 
 
 CJA237/475-W-70/1X7
 
 
 
 
140 0.194 223.8 600 SFW200-10/850 200 206.8 CJWT-1-BWT-3000, manual Φ300
160 0.207 277.8 750 SFW250-8/740 250 258.4
180 0.220 332.1 SFW320-8/850 320 310.5
200 0.232 383.2 SFW320-8/850 320 358.3
220 0.243 440.5 SFW400-8/850 400 414.1
240 0.254 502.0 SFW500-8/850 500 474.4
260 0.264 572.0 1000 SFW500-6/850 500 540.5
280 0.274 643.5 SFW630-6/990 630 608.1
300 0.284 714.6 SFW630-6/990 630 675.3


Impulse Hydro Turbine for Hydro Power Plant


Runh Power's focus of business in the EPC service of power plant. For commissioning Runh Power a project of power plant, following documents are required for the approval of investment made to foreign countries. With at least PPA and Feasibility Report in place, Runh Power is able to help the commissioner to secure private investment or loan from various Chiness national bank. 

-1) Power Purchase Agreement (For independent power producers only) 
-2) Feasibility report (In case that there is none, designers and engineers can be dispatched to compile one at the expense of commissioner.)
-3) Sovereign bonds (If sovereign bonds are acquired and the commissioner has 15 % of capital need for the project,  Runh Power could start the project while engaging China Export & Credit Insurance Corporation)
-4) Construction Permit (optional)
-5) Fire permit (optional)
-6) Environmental impact assessment (optional)
-7) Land Lease (optional)
-8) Power Generation Power (optional)
-9) Other documents deemed helpful (optional)

Impulse Hydro Turbine for Hydro Power Plant


Runh Power is dedicated to provide package service covering from end to end of a construction project of power plant.Services included in an EPC project unfolds in the following order, which also constitutes Runh Power's scope of service.

1.The Argumentation of Project
   
a. Verification of documents submitted
    b. Audition of documents by the authority
    c. Signing the contract
2. Engineering Design
    a. Selection of a complete set of equipment according to the request or Runh Power's recommandation or the request from the commissioner.
    b. Design of overall layout and all the sub-systems within the parameter of power plant. 
    c. Selection of personnel participating in the project
    d. Submission of technical solution to the commissioner for review and approval.
3.Equipment Purchase& Transportation
    a.Turbo Generator Set and its auxiliary systems (boiler, condensing water collector, deaerator, high pressure and low pressure superheaters, power distribution system. etc )
    b. All the construction material, tools, spare parts and other necessities of the project
4. Civil Construction
    a. All the civil construction work within the parameter of power plant
5. Operation & Maintenance
    a. Operation of power plant (technical counseling) (Optional)
    b.Regular maintenance and inspection (Optional)
    c.Technical Training Program for Power Plant Personnel (Optional)
    d.General Overhaul (Optional)
6. Installation & Testing
    a.Installation & testing for all systems & equipment provided by Runh Power
    b.Installation, testing & trail run of all systems of a power plant (Optional)
    c.Installation, testing & trail run of entire power plant (Optional)
7. Supply of Spare Parts
    a. Long-term supply of spare parts and other consumibles.(Optional)

Copy and paste superlinks below to your browser to view more products&services of Runh Power:

Integraed Turbine Island:
http://runhpower.en.made-in-china.com/product/hbJmEuBKJdfU/China-Integrated-Turbine-Island.html

Condensing Steam Turbinehttp://runhpower.en.made-in-china.com/product/tbEmABSCZwaZ/China-Condensing-Steam-Turbine-of-Runh-Power.html

Condensing & Extracting Steam Turbine: http://runhpower.en.made-in-china.com/product/GqxJRuXYTZAE/China-Condensing-Extracting-Steam-Turbine-of-Runh-Power.html

Complete catalog of Runh Power's service and productshttp://runhpower.en.made-in-china.com/product/DXOEPrMAqpUn/China-The-Catalog-of-Runh-Power-s-Service-Power-Plant-EPC-Contractor.html


Impulse Hydro Turbine for Hydro Power PlantImpulse Hydro Turbine for Hydro Power Plant

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Gold Member Since 2012

Suppliers with verified business licenses

Manufacturer/Factory, Trading Company, Group Corporation
Registered Capital
80000000 RMB
Plant Area
>2000 square meters