1.The Argumentation of Project a. Verification of documents submitted b. Audition of documents by the authority c. Signing the contract 2. Engineering Design a. Selection of a complete set of equipment according to the request or Runh Power's recommandation or the request from the commissioner. b. Design of overall layout and all the sub-systems within the parameter of power plant. c. Selection of personnel participating in the project d. Submission of technical solution to the commissioner for review and approval. 3.Equipment Purchase& Transportation a.Turbo Generator Set and its auxiliary systems (boiler, condensing water collector, deaerator, high pressure and low pressure superheaters, power distribution system. etc ) b. All the construction material, tools, spare parts and other necessities of the project 4. Civil Construction a. All the civil construction work within the parameter of power plant 5. Operation & Maintenance a. Operation of power plant (technical counseling) (Optional) b.Regular maintenance and inspection (Optional) c.Technical Training Program for Power Plant Personnel (Optional) d.General Overhaul (Optional) 6. Installation & Testing a.Installation & testing for all systems & equipment provided by Runh Power b.Installation, testing & trail run of all systems of a power plant (Optional) c.Installation, testing & trail run of entire power plant (Optional) 7. Supply of Spare Parts a. Long-term supply of spare parts and other consumibles.(Optional)