• Municipal Solid Waste Power Plant Project (MSW to energy) Renewable Energy
  • Municipal Solid Waste Power Plant Project (MSW to energy) Renewable Energy
  • Municipal Solid Waste Power Plant Project (MSW to energy) Renewable Energy
  • Municipal Solid Waste Power Plant Project (MSW to energy) Renewable Energy
  • Municipal Solid Waste Power Plant Project (MSW to energy) Renewable Energy

Municipal Solid Waste Power Plant Project (MSW to energy) Renewable Energy

Voltage: Various
Generating Methods: Various
Phase: Various
Maintenance: Available Upon Request
Operation: Available Upon Request
Transport Package: Negociable
Manufacturer/Factory, Trading Company, Group Corporation
Gold Member Since 2012

Suppliers with verified business licenses

Shandong, China
to see all verified strength labels (27)

Basic Info.

Model NO.
Various
Specification
25 to 100 MW
Trademark
Runh
Origin
Shandong Province
Production Capacity
Two Years on Average

Product Description

Confronted with the perdicament of waste disposal, many waste management enterprises choose to exploit the value of garbage over dumping them to landfill. In the field of constructing Municipal Solid Waste power plant, Runh Power excels in the aspect of :

1.Environmental friendliness accessment
2.Combustible waste selection
3.Thermal efficiency improvement
4.Neutralization treatment of smoke and ashes

Municipal Solid Waste Power Plant Project (MSW to energy) Renewable Energy

 Runh Power has acquired significant experience in the field of MSW energy generation and put it to field application in various domestic projects before finally started to deliver projects to global commissioners.

Given the characteristics of excessive toxic substances and possible erosion on the inner wall of boiler, following boilers are recommanded by Runh Power. Customized models are available upon the submission of detailed request.

Dual-drum bagasse/bark/oil palm boiler (applicable in case operational temp. is lower than 3.8MPa)


Note: circulating fluidized bed type and forced vibration type are available for all models above.

Municipal Solid Waste Power Plant Project (MSW to energy) Renewable Energy

 

For commissioning Runh Power a project of power plant, following documents are required for the approval of foreign investment. With at least PPA and Feasibility Report in place, Runh Power is able to help the commissioner to secure private investment or loan from the state bank. 

 
-1) Power Purchase Agreement (For independent power producers only) 
-2) Feasibility report (In case that there is none, designers and engineers can be dispatched to compile one at the expense of commissioner.)
-3) Sovereign bonds (If sovereign bonds are acquired and the commissioner has 15 % of capital need for the project,  Runh Power could start the project while engaging China Export & Credit Insurance Corporation)
-4) Construction Permit (optional)
-5) Fire permit (optional)
-6) Environmental impact assessment (optional)
-7) Land Lease (optional)
-8) Power Generation Power (optional)
-9) Other documents deemed helpful (optional)

 

Runh Power is dedicated to provide package service covering from end to end of a construction project of power plant.Services included in an EPC project unfolds in the following order, which also constitutes Runh Power's scope of service.

1.The Argumentation of Project
   
a. Verification of documents submitted
    b. Audition of documents by the authority
    c. Signing the contract
2. Engineering Design
    a. Selection of a complete set of equipment according to the request or Runh Power's recommandation. 
    b. Design of overall layout and all the sub-systems within the parameter of power plant. 
    c. Selection of personnel participating in the project
    d. Submission of technical solution to the commissioner for review and approval.
3.Equipment Purchase& Transportation
    a.Turbo Generator Set and its auxiliary systems (boiler, condensing water collector, deaerator, high pressure and low pressure superheaters, power distribution system. etc )
    b. All the construction material, tools, spare parts and other necessities of the project
4. Civil Construction
    a. All the civil construction work within the parameter of power plant
5. Operation & Maintenance
    a. Operation of power plant (technical counseling) (Optional)
    b.Regular maintenance and inspection (Optional)
    c.Technical Training Program for Power Plant Personnel (Optional)
    d.General Overhaul (Optional)
6. Installation & Testing
    a.Installation & testing for all systems & equipment provided by Runh Power
    b.Installation, testing & trail run of all systems of a power plant (Optional)
    c.Installation, testing & trail run of entire power plant (Optional)
7. Supply of Spare Parts
    a. Long-term supply of spare parts and other consumibles.(Optional)

Notice: EPS service, which refers to Engineering, Purchase & Supervision of Construction,is also available at your request, in case you prefer local construction contractor to international contractor.


Municipal Solid Waste Power Plant Project (MSW to energy) Renewable Energy


Copy and paste superlinks below to your browser to view more products&services of Runh Power:

 
Integraed Turbine Island: http://runhpower.en.made-in-china.com/product/hbJmEuBKJdfU/China-Integrated-Turbine-Island.html

Condensing Steam Turbine: http://runhpower.en.made-in-china.com/product/tbEmABSCZwaZ/China-Condensing-Steam-Turbine-of-Runh-Power.html

Condensing & Extracting Steam Turbine: http://runhpower.en.made-in-china.com/product/GqxJRuXYTZAE/China-Condensing-Extracting-Steam-Turbine-of-Runh-Power.html

Back Pressure Steam Turbine: http://runhpower.en.made-in-china.com/product/lMJmfuSdJOGn/China-Back-Pressure-Steam-Turbine-of-Runh-Power.html

Spare parts of Steam turbine and power plant & maintenance service:  http://runhpower.en.made-in-china.com/product/RKOmcohdCrpt/China-Quick-Wear-Parts-Washer-etc-for-Steam-Turbine-and-Power-Plant.html

Municipal Solid Waste Power Plant Project (MSW to energy) Renewable Energy
Municipal Solid Waste Power Plant Project (MSW to energy) Renewable Energy

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Gold Member Since 2012

Suppliers with verified business licenses

Manufacturer/Factory, Trading Company, Group Corporation
Registered Capital
80000000 RMB
Plant Area
>2000 square meters