• Environment-Friendly Palm Waste, Biomass Residue Waste-to-Enenrgy Power Generation
  • Environment-Friendly Palm Waste, Biomass Residue Waste-to-Enenrgy Power Generation
  • Environment-Friendly Palm Waste, Biomass Residue Waste-to-Enenrgy Power Generation
  • Environment-Friendly Palm Waste, Biomass Residue Waste-to-Enenrgy Power Generation
  • Environment-Friendly Palm Waste, Biomass Residue Waste-to-Enenrgy Power Generation

Environment-Friendly Palm Waste, Biomass Residue Waste-to-Enenrgy Power Generation

Voltage: 1000kV
Generating Methods: Various
Phase: Various
Maintenance: Available Upon Request
Operation: Available Upon Request
Transport Package: Seaworthy Package
Manufacturer/Factory, Trading Company, Group Corporation
Gold Member Since 2012

Suppliers with verified business licenses

Shandong, China
to see all verified strength labels (27)

Basic Info.

Model NO.
Various
Specification
25 to 100 MW
Trademark
Runh
Origin
Shandong Province
Production Capacity
Two Years on Average

Product Description

Please click here >>>> Contact us for more factory prices,shipping and discounts.



Runh Power is a prestigious power plant contractor in China and have incorporated the technology from B&W Volund, a Dennish corporation specializing in clean energy production. Runh Power has acquired significant experience in the field of biomass energy generation and put it to field application in various domestic projects before finally started to deliver projects to global commissioners.

Given the characteristics of excessive ash and possible erosion on the inner wall of boiler, following chain grate boilers are recommanded by Runh Power. Customized models are available upon the submission of detailed request.

Dual-drum bagasse/bark/oil palm boiler (applicable in case operational temp. is lower than 3.8MPa)
model rated evaporation
(ton/h)
operational pressure (Mpa) operational temp.ºC feed water temp.ºC remark
SHS20-2.5/400-G 20 2.5 400 104 membrane wall structure
SHS25-2.5/400-G 25 2.5 400 104  
SHS30-2.5/400-G 30 2.5 400 104  
SHS20-2.5/400-G 35 3.8 400 104  
WZ-35/3.8-G 35 3.8 450 104  
SHS50-2.5/400-G 50 2.5 400 104  
WZ-50/3.8-G 50 3.8 450 104  
SHS65-2.5/400-G 65 2.5 400 104 membrane wall structure
WZ-75/3.8-G 75 3.8 450 104 membrane wall structure
WZ-85/3.8-G 85 3.8 450 104 membrane wall structure
WZ-90/3.8-G 90 3.8 450 104 membrane wall structure
WZ-100/3.8-G 100 3.8 450 104 membrane wall structure
WZ-120/3.8-G 120 3.8 450 104 membrane wall structure
WZ-130/3.8-G 130 3.8 450 104 membrane wall structure

Fluidized Circulation Bed boiler provided by Runh Power is recommended for the operation of biomass power plant, due to it high thermal efficiency.

Link : http://runhpower.en.made-in-china.com/product/kBQmZVExRzRt/China-Coal-Firing-Circulating-Fluidized-Bed-Steam-Boiler-for-Power-Supply.html

Technical features of chain grate boiler include:

1. simple structure: its simple structure gives its the advantage of low production/maintenance cost, low weight, among many others. 

2. Simple operation: due to its simple structure, chain grate boiler is also characterized by low malfunctionality, high reliablity.

3. Minimal fuel loss: chain grate boiler provided by Runh Power has the least amount of fuel loss, air leakage, or stray ash.

4. Stable burning: air is blown from air chamers in each section set along the grate, for the optimal consumption of coal.

5. High thermal efficiency: themal loss caused by insufficient burning (Q2) and exhaust (Q4) is reduced to minimal level, which is the reason that its thermal efficiency is sufficiently higher than that of others.



Environment-Friendly Palm Waste, Biomass Residue Waste-to-Enenrgy Power Generation

 Environment-Friendly Palm Waste, Biomass Residue Waste-to-Enenrgy Power Generation

For commissioning Runh Power a project of power plant, following documents are required for the approval of foreign investment. With at least PPA and Feasibility Report in place, Runh Power is able to help the commissioner to secure private investment or loan from the state bank. 

 
-1) Power Purchase Agreement (For independent power producers only) 
-2) Feasibility report (In case that there is none, designers and engineers can be dispatched to compile one at the expense of commissioner.)
-3) Sovereign bonds (If sovereign bonds are acquired and the commissioner has 15 % of capital need for the project,  Runh Power could start the project while engaging China Export & Credit Insurance Corporation)
-4) Construction Permit (optional)
-5) Fire permit (optional)
-6) Environmental impact assessment (optional)
-7) Land Lease (optional)
-8) Power Generation Power (optional)
-9) Other documents deemed helpful (optional)

 

Runh Power is dedicated to provide package service covering from end to end of a construction project of power plant.Services included in an EPC project unfolds in the following order, which also constitutes Runh Power's scope of service.

1.The Argumentation of Project
   
a. Verification of documents submitted
    b. Audition of documents by the authority
    c. Signing the contract
2. Engineering Design
    a. Selection of a complete set of equipment according to the request or Runh Power's recommandation.
    b. Design of overall layout and all the sub-systems within the parameter of power plant. 
    c. Selection of personnel participating in the project
    d. Submission of technical solution to the commissioner for review and approval.
3.Equipment Purchase& Transportation
    a.Turbo Generator Set and its auxiliary systems (boiler, condensing water collector, deaerator, high pressure and low pressure superheaters, power distribution system. etc )
    b. All the construction material, tools, spare parts and other necessities of the project
4. Civil Construction
    a. All the civil construction work within the parameter of power plant
5. Operation & Maintenance
    a. Operation of power plant (technical counseling) (Optional)
    b.Regular maintenance and inspection (Optional)
    c.Technical Training Program for Power Plant Personnel (Optional)
    d.General Overhaul (Optional)
6. Installation & Testing
    a.Installation & testing for all systems & equipment provided by Runh Power
    b.Installation, testing & trail run of all systems of a power plant (Optional)
    c.Installation, testing & trail run of entire power plant (Optional)
7. Supply of Spare Parts
    a. Long-term supply of spare parts and other consumibles.(Optional)

Notice: EPS service, which refers to Engineering, Purchase & Supervision of Construction,is also available at your request, in case you prefer local construction contractor to international contractor.

Environment-Friendly Palm Waste, Biomass Residue Waste-to-Enenrgy Power Generation



Click the links below to view more products&services of Runh Power:

 
Condensing Steam Turbine


Condensing & Extracting Steam Turbine


Back Pressure Steam Turbine

Spare parts of Steam turbine and power plant & maintenance service


Environment-Friendly Palm Waste, Biomass Residue Waste-to-Enenrgy Power Generation
Environment-Friendly Palm Waste, Biomass Residue Waste-to-Enenrgy Power Generation

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Gold Member Since 2012

Suppliers with verified business licenses

Manufacturer/Factory, Trading Company, Group Corporation
Registered Capital
80000000 RMB
Plant Area
>2000 square meters