Inclined Jet Turbine, Hydro Generator Hydro Turbine for Hydro Power Plant

Product Details
Output Type: AC Three Phase
Size: Various
Type: Vertical & Horizontal
Gold Member Since 2012

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Years of Export Experience
The export experience of the supplier is more than 10 years
Experienced Team
The supplier has 84 foreign trading staff(s) and 59 staff(s) with over 6 years of overseas trading experience
Exhibition Experience
The supplier had participated in offline trade shows, you can check the Audit Report for more information
Management Certification
The supplier has quality management system certification, including:
ISO9001:2015 certificate
ISO45001:2018 certificate
ISO14001
to see all verified strength labels (28)
  • Inclined Jet Turbine, Hydro Generator Hydro Turbine for Hydro Power Plant
  • Inclined Jet Turbine, Hydro Generator Hydro Turbine for Hydro Power Plant
  • Inclined Jet Turbine, Hydro Generator Hydro Turbine for Hydro Power Plant
  • Inclined Jet Turbine, Hydro Generator Hydro Turbine for Hydro Power Plant
  • Inclined Jet Turbine, Hydro Generator Hydro Turbine for Hydro Power Plant
  • Inclined Jet Turbine, Hydro Generator Hydro Turbine for Hydro Power Plant
Find Similar Products

Basic Info.

Model NO.
Various
Bearing Support
Umbrella & Hanging
Speed
Medium Speed
Bearing Number
3
Standard
Standard
Head
50 to 170m
Range of Supply
Turbine-Generator Set
Maintenance
Available Upon Request
Commissioning
Available Upon Request
Period of Warranty
3 Years
Transport Package
in Bulk
Trademark
Runh
Origin
Shandong Province
Production Capacity
500 Units Per Year

Product Description

Inclined jet turbine is one type of hydro turbine with relatively lower head, normally ranging from 50 to 300 meter, and lower power (10 to 500 KW). It is commonly used in small-scale hydro power plant. Runh Power is dedicated to provide complete set of hydro-turbine and generator unit.

Technical parameters of hydro turbine provided by Runh Power:

1.Head: 50 to 250 meters (turbine with head higher than 250 meters can be customize-made)
2.Flow: no more than 1.840 m3/s 
3.Capacity of generator : 20 to 2000 KV
4.Output of the unit :18.0 to 2622 KW

Following is a table of parameter of part of Runh Power's inclined jet turbine: 
(Complete catalog of inclined jet turbine is available upon your request.)

 
model turbine generator output of the unit
(kW)
governor valve
head
(m)
Flow
(m3/s)
Output
 (kv)
speed
 (r/min)
model capacity
(kW)
XJA-W-32/1-X5 50 0.059 21.4 1000 SFW20-6/368 20 18.0 manual φ250
60 0.064 29.0 SFW28-6/368 28 24.9
70 0.068 36.1 SFW35-6/423 35 31.7
80 0.074 44.1 SFW10-6/423 40 38.8
90 0.079 52.6 SFW50-6/493 50 46.6
100 0.083 61.2 SFW56-6/493 55 54.2
XJA-W-32/1X8 50 0.145 57.6 1000 SFW50-6/493 50 50.6 manual φ250
60 0.159 77.9 SFW75-6/560 75 70.1
70 0.171 97.6 SFW75-6/560 75 87.8
80 0.183 117.9 SFW100-6/560 100 106.6
90 0.194 137.9 SFW125-6/560 125 124.7
100 0.205 158.9 SFW125-6/560 100 143.8
 
 
 
XJA-W-32/1X9 
 
 
 
 
35 0.1333 38.0 750 SFW30-8/4.93 30 33.8 manual φ250
40 0.1425 46.2 SFW40-8/4.93 40 41.1
50 0.1593 63.1 SFW50-8/4.93 50 55.5
60 0.1745 8531 1000 SFW75-6/4.93 75 76.6
70 0.1885 107.0 SFW100-6/560 100 96.3
80 0.2015 129.5 SFW100-6/560 100 116.0
90 0.2137 152.1 SFW125-6/560 125 137.6
100 0.2253 174.8 SFW160-6/560 160 159.0

Inclined Jet Turbine, Hydro Generator Hydro Turbine for Hydro Power Plant


Runh Power's focus of business in the EPC service of power plant. For commissioning Runh Power a project of power plant, following documents are required for the approval of investment made to foreign countries. With at least PPA and Feasibility Report in place, Runh Power is able to help the commissioner to secure private investment or loan from various Chiness national bank. 

-1) Power Purchase Agreement (For independent power producers only) 
-2) Feasibility report (In case that there is none, designers and engineers can be dispatched to compile one at the expense of commissioner.)
-3) Sovereign bonds (If sovereign bonds are acquired and the commissioner has 15 % of capital need for the project,  Runh Power could start the project while engaging China Export & Credit Insurance Corporation)
-4) Construction Permit (optional)
-5) Fire permit (optional)
-6) Environmental impact assessment (optional)
-7) Land Lease (optional)
-8) Power Generation Power (optional)
-9) Other documents deemed helpful (optional)

Inclined Jet Turbine, Hydro Generator Hydro Turbine for Hydro Power Plant
Runh Power is dedicated to provide package service covering from end to end of a construction project of power plant.Services included in an EPC project unfolds in the following order, which also constitutes Runh Power's scope of service.

1.The Argumentation of Project
   
a. Verification of documents submitted
    b. Audition of documents by the authority
    c. Signing the contract
2. Engineering Design
    a. Selection of a complete set of equipment according to the request or Runh Power's recommandation or the request from the commissioner.
    b. Design of overall layout and all the sub-systems within the parameter of power plant. 
    c. Selection of personnel participating in the project
    d. Submission of technical solution to the commissioner for review and approval.
3.Equipment Purchase& Transportation
    a.Turbo Generator Set and its auxiliary systems (boiler, condensing water collector, deaerator, high pressure and low pressure superheaters, power distribution system. etc )
    b. All the construction material, tools, spare parts and other necessities of the project
4. Civil Construction
    a. All the civil construction work within the parameter of power plant
5. Operation & Maintenance
    a. Operation of power plant (technical counseling) (Optional)
    b.Regular maintenance and inspection (Optional)
    c.Technical Training Program for Power Plant Personnel (Optional)
    d.General Overhaul (Optional)
6. Installation & Testing
    a.Installation & testing for all systems & equipment provided by Runh Power
    b.Installation, testing & trail run of all systems of a power plant (Optional)
    c.Installation, testing & trail run of entire power plant (Optional)
7. Supply of Spare Parts
    a. Long-term supply of spare parts and other consumibles.(Optional)

Inclined Jet Turbine, Hydro Generator Hydro Turbine for Hydro Power Plant



Copy and paste superlinks below to your browser to view more products&services of Runh Power:

Integraed Turbine Island:
http://runhpower.en.made-in-china.com/product/hbJmEuBKJdfU/China-Integrated-Turbine-Island.html

Condensing Steam Turbinehttp://runhpower.en.made-in-china.com/product/tbEmABSCZwaZ/China-Condensing-Steam-Turbine-of-Runh-Power.html

Condensing & Extracting Steam Turbine: http://runhpower.en.made-in-china.com/product/GqxJRuXYTZAE/China-Condensing-Extracting-Steam-Turbine-of-Runh-Power.html

Complete catalog of Runh Power's service and productshttp://runhpower.en.made-in-china.com/product/DXOEPrMAqpUn/China-The-Catalog-of-Runh-Power-s-Service-Power-Plant-EPC-Contractor.html


Inclined Jet Turbine, Hydro Generator Hydro Turbine for Hydro Power PlantInclined Jet Turbine, Hydro Generator Hydro Turbine for Hydro Power Plant

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier