High Quality Extraction Condensing Steam Turbine

Product Details
Phase: Three Phase
Capacity: 1.5mw~60mw
Speed: 3000r/M; 5600r/M; 6500r/M
Gold Member Since 2012

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Years of Export Experience
The export experience of the supplier is more than 10 years
Experienced Team
The supplier has 84 foreign trading staff(s) and 59 staff(s) with over 6 years of overseas trading experience
Exhibition Experience
The supplier had participated in offline trade shows, you can check the Audit Report for more information
Management Certification
The supplier has quality management system certification, including:
ISO9001:2015 certificate
ISO45001:2018 certificate
ISO14001
to see all verified strength labels (28)
  • High Quality Extraction Condensing Steam Turbine
  • High Quality Extraction Condensing Steam Turbine
  • High Quality Extraction Condensing Steam Turbine
  • High Quality Extraction Condensing Steam Turbine
  • High Quality Extraction Condensing Steam Turbine
  • High Quality Extraction Condensing Steam Turbine
Find Similar Products

Basic Info.

Model NO.
Steam turbine
Inlet Steam Pressure
2.35mpa~8.83mpa
Inlet Temperature
390c~535c
Maximum Inlet Steam Quantity
22tph~350tph
Cooling Type
Air Cooling/ Water Cooling
Extraction Steam Pressure
0.196mpa~3.92mpa
Normal Extraction Steam Qualtity/ Maximu
12/15tph~170/200tph
Transport Package
Standard Packing
Specification
1MW~60MW
Trademark
Runh power
Origin
China
HS Code
8402119000
Production Capacity
20/Year

Product Description

\Runh Power is an EPC contractor and complete equipment supplier, which has performed more than 20 international power projects in Turkey, Ukraine, India, etc. With 18 years' development, now we provide EPC/turnkey service and complete set of equipment such as STG, BTG, BOP, etc for all kinds of power projects such as coal fired power plant, biomass power plant, CCPP, waste heat power plant, new energy power plant, etc. Our service and products are highly appreciated by the owner. And we mainly own the following advantages:

1 Professional design institute:
We own independent design institute, about 50 experienced and Professional engineers for all systems of power plant in our design institute, they could make proposals for power projects of various sizes. 

2 Cost effective equipment:
We establish cooperative relationship with domestic well-known OEMs, their products employs the most advanced technology and their quality could be guaranteed. And they provide equipment for us with a relatively competitive price. Besides, we have undertaken 28 international power projects which also could prove that our products and services are very competitive.

3 Competitive delivery time:
Time is very important, especially for power projects and we could guarantee and provide competitive delivery time. In order to achieve this goal, we mainly have 4 steps:
Step 1: Design, our design institute could guarantee the design schedule;
Step 2: Manufacturing, our cooperative OEMs will arrange our order preferentially;
Step 3: Local branch, we have 4 local branch in domestic, and they will manufacture the manufacturing schedule and quality of our orders.
Step 4: Rich experienced and professional team, our team have accumulated rich experience and they could solve the problems and risks and avoid potential delays in delivery.

4 After-sales service;
Many owners worry about this, especially for international power projects and we provide complete after sales service to reduce your risks such as one-to-one service system; periodic visiting; customer documents; global maintenance team, etc.

5. Second hand equipment
We own abundant second-hand equipment which are under quite good condition, their price is much cheaper and the construction period could be shorter. We provide all round service for secondhand equipment such as Renovation & equipment retrofit ,Re-location of power plant, Unit capacity upgrade, Performance upgrade and energy saving proposal, System upgrade (Instrumentation, energy efficient electrics, etc.) And what's more, we provide the same guarantee period compared with new equipment.

High Quality Extraction Condensing Steam TurbineHigh Quality Extraction Condensing Steam TurbineHigh Quality Extraction Condensing Steam TurbineHigh Quality Extraction Condensing Steam TurbineHigh Quality Extraction Condensing Steam TurbineHigh Quality Extraction Condensing Steam TurbineHigh Quality Extraction Condensing Steam TurbineHigh Quality Extraction Condensing Steam Turbine

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier