Double Extraction Condensing Steam Turbine

Product Details
Phase: Three Phase
Capacity: 12mw~60mw
Speed: 3000r/M; 5600r/M; 6500r/M
Manufacturer/Factory, Trading Company, Group Corporation
Gold Member Since 2012

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Years of Export Experience
The export experience of the supplier is more than 10 years
Experienced Team
The supplier has 84 foreign trading staff(s) and 59 staff(s) with over 6 years of overseas trading experience
Exhibition Experience
The supplier had participated in offline trade shows, you can check the Audit Report for more information
Management Certification
The supplier has quality management system certification, including:
ISO9001:2015 certificate
ISO45001:2018 certificate
ISO14001
to see all verified strength labels (28)
  • Double Extraction Condensing Steam Turbine
Find Similar Products

Basic Info.

Model NO.
steam turbine
Inlet Steam Pressure
3.43mpa~8.83mpa
Inlet Temperature
435c~535c
Maximum Inlet Steam Quantity
100tph~500tph
Cooling Type
Air Cooling/ Water Cooling
First Stage Extraction Steam Pressure
0.49mpa~3.92mpa
First Extraction Steam Qualtity
35tph~150tph
Second Stage Extraction Steam Pressure
0.196mpa~1.57mpa
Secondary Extraction Steam Qualtity
40tph~150tph
Transport Package
Standard Packing
Specification
1MW~60MW
Trademark
Runh power
Origin
China
HS Code
8402119000
Production Capacity
20/Year

Product Description

Runh Power is an EPC contractor and complete equipment supplier, which has performed more than 20 international power projects in Turkey, Ukraine, India, etc. With 18 years' development, now we provide EPC/turnkey service and complete set of equipment such as STG, BTG, BOP, etc for all kinds of power projects such as coal fired power plant, biomass power plant, CCPP, waste heat power plant, new energy power plant, etc. Our service and products are highly appreciated by the owner. And we mainly own the following advantages:

1 Professional design institute:
2 Cost effective equipment:
3 Competitive delivery time:
4 After-sales service;
5. Second hand equipment


Double Extraction Condensing Steam TurbineDouble Extraction Condensing Steam TurbineDouble Extraction Condensing Steam TurbineDouble Extraction Condensing Steam TurbineDouble Extraction Condensing Steam TurbineDouble Extraction Condensing Steam TurbineDouble Extraction Condensing Steam TurbineDouble Extraction Condensing Steam Turbine

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier