Double Extraction Condensing Steam Turbine

Product Details
Voltage: 10kV
Generating Methods: Thermal Power Generation
Phase: Three Phase
Gold Member Since 2012

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Years of Export Experience
The export experience of the supplier is more than 10 years
Experienced Team
The supplier has 84 foreign trading staff(s) and 59 staff(s) with over 6 years of overseas trading experience
Exhibition Experience
The supplier had participated in offline trade shows, you can check the Audit Report for more information
Management Certification
The supplier has quality management system certification, including:
ISO9001:2015 certificate
ISO45001:2018 certificate
ISO14001
to see all verified strength labels (28)
  • Double Extraction Condensing Steam Turbine
  • Double Extraction Condensing Steam Turbine
  • Double Extraction Condensing Steam Turbine
  • Double Extraction Condensing Steam Turbine
  • Double Extraction Condensing Steam Turbine
  • Double Extraction Condensing Steam Turbine
Find Similar Products

Basic Info.

Model NO.
RUNH
Capacity
25MW-1000MW
Customerized
Yes
OEM
Yes
Transport Package
Standard Packing
Specification
1-60mw
Trademark
RUNH
Origin
China
HS Code
8402119000
Production Capacity
7

Product Description

Double Extraction Condensing Steam TurbineDouble Extraction Condensing Steam TurbineDouble Extraction Condensing Steam TurbineDouble Extraction Condensing Steam Turbine
Characterstics:
1.Cogeneration steam turbine, working as a main mover in a thermal power station and having a wide range of application;

2. Covering various inlet conditions and extraction conditions ;

3. A special steam turbine applicable to make good use of one or more types of low level heat resource;

4. Respective adjustment of thermal loading and electric loading to meet customer's requirements thereupon;

5. Run under extraction or pure condensing operating condition;

6. Rational construction, sensitive governing and smooth running;

7. Fuly hydraulic and DEH governing system;

8. Higher quality, national medal for quality.

Runh Power, as an EPC contractor and complete equipment supplier, which has performed more than 20 international power projects in Turkey, Ukraine, India, etc. With 18 years' development, now we provide EPC/turnkey service and complete set of equipment such as STG, BTG, BOP, etc for all kinds of power projects such as coal fired power plant, biomass power plant, CCPP, waste heat power plant, new energy power plant, etc. Our service and products are highly appreciated by the owner. And we mainly own the following advantages:

1 Professional design institute:
We own independent design institute, about 50 experienced andprofessionalengineers for all systems of power plant in our design institute, they could make proposals for power projects of various sizes. 

2 Cost effective equipments:
We establish cooperative relationship with domestic well-known OEMs, their products employs the most advanced technology and their quality could be guaranteed. And they provide equipments for us with a relatively competitive price. Besides, we have undertaken 28 international power projects which also could prove that our products and services are very competitive.

3 Competitive delivery time:
Time is very important, especially for power projects and we could guarantee and provide competitive delivery time. In order to achieve this goal, we mainly have 4 steps:
Step 1: Design, our design institute could guarantee the design schedule;
Step 2: Manufacturing, our cooperative OEMs will arrange our order preferentially;
Step 3: Local branch, we have 4 local branch in domestic, and they will manufacture the manufacturing schedule and quality of our orders.
Step 4: Rich experienced and professional team, our team have accumulated rich experience and they could solve the problems and risks and avoild potential delays in delivery.

4 After-sales service;
Many owners worry about this, especially for international power projects and we provide complete after sales service to reduce your risks such as one-to-one service system; periodic visiting; customer documents; global maintenance team, etc.

5. Second hand equipment
We own abundant secondhant equipment which are under quite good condition, their price is much cheaper and the construction period could be shorter. We provide all round service for secondhand equipments such asRenovation & equipment retrofit ,Re-location of power plant, Unit capacity upgrade, Performance upgrade and energy saving proposal, System upgrade (Instrumentation, energy efficient electrics, etc.) And what's more, we provide the same guarantee period compared with new equipments.

Double Extraction Condensing Steam Turbine

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier