Indonesia Coal Fired Power Plant EPC Contractor

Product Details
Voltage: 380V
Generating Methods: Thermal Power Generation
Phase: Three Phase
Manufacturer/Factory, Trading Company, Group Corporation
Gold Member Since 2012

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Years of Export Experience
The export experience of the supplier is more than 10 years
Experienced Team
The supplier has 84 foreign trading staff(s) and 59 staff(s) with over 6 years of overseas trading experience
Exhibition Experience
The supplier had participated in offline trade shows, you can check the Audit Report for more information
Management Certification
The supplier has quality management system certification, including:
ISO9001:2015 certificate
ISO45001:2018 certificate
ISO14001
to see all verified strength labels (28)
  • Indonesia Coal Fired Power Plant EPC Contractor
  • Indonesia Coal Fired Power Plant EPC Contractor
  • Indonesia Coal Fired Power Plant EPC Contractor
  • Indonesia Coal Fired Power Plant EPC Contractor
  • Indonesia Coal Fired Power Plant EPC Contractor
  • Indonesia Coal Fired Power Plant EPC Contractor
Find Similar Products

Basic Info.

Model NO.
RUNH
Capacity
20 MW~660MW
Customerized
Yes
OEM
Yes
Fuel
Biomass and Coal
Transport Package
Standard Packing
Specification
1MW-660MW
Trademark
RUNH
Origin
China
HS Code
8402119000
Production Capacity
1-5/Year

Product Description

Indonesia Coal Fired Power Plant EPC Contractor
Runh Power is an EPC contractor and complete equipment supplier, which is founded in 1996. With 20 years development, Runh Power has performed more than 100 international power projects in Turkey, Ukraine, India,etc. Our service and products are highly appreciated by the owner. And we mainly own the following advantages:

1 Professional design institute:
We own independent design institute--Runh Power design institute, about 50 experienced and
professional?engineers for all systems of power plant in our design institute, they could make proposals for power projects of various sizes. ?

2 Cost ?effective equipments:
We establish cooperative relationship with domestic well-known OEMs, their products employs the most advanced ?technology and their quality could be guaranteed. And they provide equipments for us with a relatively competitive price. Besides, we have undertaken 28 international power projects which also could prove that our products and services are very competitive.

3 Competitive delivery time:
Time is very important, especially for power projects and we could guarantee and provide competitive delivery time. In order to achieve this goal, we mainly have 4 steps:
Step 1: Design, our design institute could guarantee the design schedule;
Step 2: Manufacturing, our cooperative OEMs will arrange our order preferentially;
Step 3: Local branch, we have 4 local branch in domestic, and they will manufacture the manufacturing schedule and quality of our orders.
?Step 4: Rich experienced and professional team, our team have accumulated rich experience and they could solve the problems and risks and avoild potential delays in delivery.
? ?
4 After-sales service;
Many owners worry about this, especially for international power projects and we provide complete after sales service to reduce your risks such as one-to-one service system; periodic visiting; customer documents; global maintenance team, etc.?

5 Project reference list?

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier