• Steam Turbine Island EPC Contractor of Power Plant
  • Steam Turbine Island EPC Contractor of Power Plant
  • Steam Turbine Island EPC Contractor of Power Plant
  • Steam Turbine Island EPC Contractor of Power Plant
  • Steam Turbine Island EPC Contractor of Power Plant
  • Steam Turbine Island EPC Contractor of Power Plant

Steam Turbine Island EPC Contractor of Power Plant

Voltage: Various
Generating Methods: Thermal Power Generation
Phase: Three Phase
Nature: Brand-New & Second-Handed
Maintenance: Available Upon Request
Part Supply: Available Upon Request
Samples:
US$ 1000000/Piece 1 Piece(Min.Order)
| Request Sample
Manufacturer/Factory, Trading Company, Group Corporation
Gold Member Since 2012

Suppliers with verified business licenses

Shandong, China
to see all verified strength labels (27)
  • Overview
  • Product Description
  • Company Profile
  • References
  • Certifications
Overview

Basic Info.

Model NO.
Various
Commissioning
Available Upon Request
Transport Package
in Bulk
Specification
1.5MW to 600MW
Trademark
Runh
Origin
Shandong Province
Production Capacity
100 Units Per Year

Product Description

Please click here >>>> Contact us for more factory prices,shipping and discounts.
Steam Turbine Island EPC Contractor of Power Plant
 
Product Description

Steam turbine island refers to a set of steam turbine, generator and their auxiliary systems. It is the core component of a power plant as steam turbine island is the part where electricity is generated through the rotating motion of turbine blade.

Runh Power has been dedicated to provide steam turbine island for global power plants and has take a series of power plant construction projects since its foundation. Runh Power is proud of delivering purchase, installation, commissioning and maintenance of turbo-generator, steam turbine, or entire power plant.


Steam Turbine Island EPC Contractor of Power Plant

A complete set of steam turbine island comprises of following equipments and sub-systems: 

1.Turbine-generator set  -
--power is generated through the action of generator driven by the turbine connected to it.
2.Water-condensation system
--
steam is condensed to water to be circulated to boiler and heated again.
3.Vacuum system
    A.sub-system of main steam
(
where steam circulates to propel the blades of turbine)
    B.water cycle system (
where water circulates from condenser to be heated again)
    C.DCS system (
monitors the operation of turbine and adjusts output rate)
    D. deaerating &water supplying system (
where oxygen is removed to ensure good operation environment and water is supplied)
4. Cooling Air system
(for air-cooled unit only)
5. Generator system ( electricity is generated in this system)

Steam Turbine Island EPC Contractor of Power Plant

 

Company Profile

Runh Power doesn't merely positions itself as a supplier of whole-set power generation equipment. The main focus of Runh Power lies in the international power plant construction project on EPC basis (engineering, purchase & construction). Turn-key project, as it's sometimes referred to as, covers the entire construction from end to end, and in most of the cases, Runh Power is capable of financing the project as well. 

Runh Power is proud of our detailed set of protocol implemented to present our professionalism and dedication to international buyers of Runh Power's services. Our protocol of delivering power plant construction project is as follow:
 
1.The Argumentation of Project
2. Engineering Design
    a. Turbo-Gen Set and its auxiliary systems
    b.Layout of Condensed Water System
    c.Layout of Heat System
    d.Civil Construction and Structure of Turbo-Gen Set
3.Equipment Purchase
    a.Turbo Generator Set and its auxiliary systems
    b.Condensed Water System
    c.Vacuum System
    d.Lower Temperature Heating System
4. Civil Construction
    a.Foundation and the upper structure of the Turbo Generator House
    b.Foundation of Turbo-Gen Set and its auxiliary systems
    c.Foundation of other structures
5. Operation & Maintenance
    a.Operation of power plant (technical counseling)
    b.Regular maintenance and inspection
    c.Technical Training Program for power plant personnel
    d.General Overhaul
6. Installation & Testing
    a.Installation & testing for all systems & equipment provided by Runh Power
    b.Installation, testing & trail run of all systems of a power plant (Optional)
    c.Installation, testing & trail run of entire power plant (Optional)
7. Supply of Spare Parts



Steam Turbine Island EPC Contractor of Power Plant


Reference List 

References

Runh Power has participated in over 200 international projects since its foundation, with installed capacity ranging from 15MW to 350MW.  Four of the cases are presented below.
 

No. Item Project detail
01 Commissioner LafargeHolcim Century Paper Mill Polat SPGCL
02 Location Gombe State, Nigeria Lahore, Pakistan Turkey India
03 Scope of service EPC project Engineering, Purchase, Supervision of construction EPC project EPC project
04 Application service power plant
of a cement factory
service power station of a paper mill independent power plant independent power plant
05 Model air-cooled condensing 
turbine island
condensing/extracting turbine condensing turbine reheat turbine
06 Brand Simons HTP HTP HTC
07 Standard of engineering DIN. GB GB GB
08 Layout single-story layout with horizontal steam discharge downward steam discharge downward steam discharge downward steam discharge
09 Technical parameters presure of steam inlet:8.5MP
tem. of steam inlet: 435C.
rated power:16.5MW
back pressure:15KPa
presure of steam inlet:4.9MP
tem. of steam inlet: 475C.
rated power:18MW
pressure of extraction:1.1MP
flow of extracted steam:54.6Mpa
back pressure:15KPa
presure of steam inlet:8.83MP
tem. of steam inlet: 435C.
rated power:51MW
back pressure:4.9KPa
presure of steam inlet:16.7MP
tem. of steam inlet: 538C.
rated power:300MW
pressure of extraction:1.1MP
back pressure:10KPa
10 Performance (under standard condition) heat rate:2467kcal/kw
steam rate:4.16kg/kw
heat rate:2206.5kcal/kw heat rate:2215.3kcal/kw
steam rate:4.16kg/kw
steam rate:3.64kg/kw
 
Certifications

Steam Turbine Island EPC Contractor of Power Plant



 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Gold Member Since 2012

Suppliers with verified business licenses

Manufacturer/Factory, Trading Company, Group Corporation
Registered Capital
80000000 RMB
Plant Area
>2000 square meters