Voltage: | 1000kV |
---|---|
Generating Methods: | Thermal Power Generation |
Phase: | Three Phase |
Still deciding? Get samples of US$ 1000000/Piece
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Francis Turbine, as the most commonly used turbine in hydro power generation, has following technical features, compared with other models of hydro turbine.
1. Compact structure: the structure of Francis turbine is both compact and simple, including volute, ring socket, water distributor, capping, runner and so on.
2. Wide range of water head: the applicable head ranges from 20 meters to 700 meters.(the head in application generally falls between 50 to 400 meters in practice. )
3. Wide range of output power : it ranges from tens of kilowatt to hundreds of thousand kilowatts. (the maximum output of Francis turbine has exceeded 700.000 kilowatt)
4. Minimum maintenance cost: the pump plate is non-contact sealed, which doesn't require regular changing of cooling water and lubricant, thus ensures extraordinarily long service life.
Scope of supply of Runh Power: Hydro-turbine and generator unit.
Technical parameters of Francis turbine provided by Runh Power:
1.Head: 260 to 725 meters (turbine with head higher than 725 meters can be customize-made)
2.Flow: no more than 2.03 m3/s
3.Capacity of generator : 20 to 6300 KV
4.Output of the unit :18.0 to 5585 KW
Following is a table of parameter of part of Runh Power's Francis turbine:
(Complete catalog of inclined jet turbine is available upon your request.)
Model | Turbine | Generator | Governor | Valve | ||||
head (m) |
Flow (m3/s) |
Output (kv) | speed (r/min) | model | capacity(kW) | |||
HLD54-WJ-42 | 38.6 | 0.27 | 83 | 1000 | SFW75-6/493 | 75 | SDT | Φ400 |
46.8 | 0.32 | 119 | SFW100-6/560 | 100 | ||||
51.9 | 0.34 | 138 | SFW125-6/560 | 125 | ||||
62.5 | 0.38 | 180 | SFW160-6/650 | 160 | ||||
HLD54-WJ-50 | 36 | 0.38 | 111 | 750 | SFW100-8/560 | 100 | SDT BWT-3000 | Φ600 |
41.7 | 0.42 | 140 | SFW125-8/650 | 125 | ||||
49.6 | 0.45 | 181 | SFW160-8/650 | 160 | ||||
57 | 0.49 | 223 | 1000 | SFW200-6/650 | 200 | |||
66 | 0.52 | 280 | SFW250-6/740 | 250 | ||||
77 | 0.57 | 350 | SFW320-6/740 | 320 | ||||
89.7 | 0.61 | 400 | SFW400-6/850 | 400 | ||||
104 | 0.66 | 550 | SFW500-6/860 | 500 | ||||
HLD54-WJ-60 | 51.2 | 0.68 | 283 | 750 | SFW250-8/740 | 250 | BWT-3000 | Φ600 |
59.4 | 0.74 | 353 | SFW320-8/850 | 320 | ||||
70.3 | 0.82 | 455 | SFW400-8/850 | 400 | ||||
81.2 | 0.85 | 562 | 1000 | SFW500-6/850 | 500 | |||
94.0 | 0.92 | 701 | SFW630-6/990 | 630 | ||||
108.0 | 1.01 | 872 | SFW800-6/993 | 800 | ||||
127.5 | 1.12 | 1109 | SFW1000-6/1180 | 1000 | ||||
148.4 | 1.22 | 1367 | SFW1250-6/1180 | 1250 |
Runh Power is dedicated to provide package service covering from end to end of a construction project of power plant.Services included in an EPC project unfolds in the following order, which also constitutes Runh Power's scope of service.
1.The Argumentation of Project
a. Verification of documents submitted
b. Audition of documents by the authority
c. Signing the contract
2. Engineering Design
a. Selection of a complete set of equipment according to the request or Runh Power's recommandation or the request from the commissioner.
b. Design of overall layout and all the sub-systems within the parameter of power plant.
c. Selection of personnel participating in the project
d. Submission of technical solution to the commissioner for review and approval.
3.Equipment Purchase& Transportation
a.Turbo Generator Set and its auxiliary systems (boiler, condensing water collector, deaerator, high pressure and low pressure superheaters, power distribution system. etc )
b. All the construction material, tools, spare parts and other necessities of the project
4. Civil Construction
a. All the civil construction work within the parameter of power plant
5. Operation & Maintenance
a. Operation of power plant (technical counseling) (Optional)
b.Regular maintenance and inspection (Optional)
c.Technical Training Program for Power Plant Personnel (Optional)
d.General Overhaul (Optional)
6. Installation & Testing
a.Installation & testing for all systems & equipment provided by Runh Power
b.Installation, testing & trail run of all systems of a power plant (Optional)
c.Installation, testing & trail run of entire power plant (Optional)
7. Supply of Spare Parts
a. Long-term supply of spare parts and other consumibles.(Optional)
Copy and paste superlinks below to your browser to view more products&services of Runh Power:
Integraed Turbine Island: http://runhpower.en.made-in-china.com/product/hbJmEuBKJdfU/China-Integrated-Turbine-Island.html
Condensing Steam Turbine: http://runhpower.en.made-in-china.com/product/tbEmABSCZwaZ/China-Condensing-Steam-Turbine-of-Runh-Power.html
Condensing & Extracting Steam Turbine: http://runhpower.en.made-in-china.com/product/GqxJRuXYTZAE/China-Condensing-Extracting-Steam-Turbine-of-Runh-Power.html
Complete catalog of Runh Power's service and products: http://runhpower.en.made-in-china.com/product/DXOEPrMAqpUn/China-The-Catalog-of-Runh-Power-s-Service-Power-Plant-EPC-Contractor.html