Voltage: | 500kV |
---|---|
Generating Methods: | Thermal Power Generation |
Phase: | Three Phase |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
No. | Item | Project detail | |||
01 | Commissioner | LafargeHolcim | Century Paper Mill | Polat | SPGCL |
02 | Location | Gombe State, Nigeria | Lahore, Pakistan | Turkey | India |
03 | Scope of service | EPC project | Engineering, Purchase, Supervision of construction | EPC project | EPC project |
04 | Application | service power plant of a cement factory |
service power station of a paper mill | independent power plant | independent power plant |
05 | Model | air-cooled condensing turbine island |
condensing/extracting turbine | condensing turbine | reheat turbine |
06 | Brand | Simons | HTP | HTP | HTC |
07 | Standard of engineering | DIN. | GB | GB | GB |
08 | Layout | single-story layout with horizontal steam discharge | downward steam discharge | downward steam discharge | downward steam discharge |
09 | Technical parameters | presure of steam inlet:8.5MP tem. of steam inlet: 435C. rated power:16.5MW back pressure:15KPa |
presure of steam inlet:4.9MP tem. of steam inlet: 475C. rated power:18MW pressure of extraction:1.1MP flow of extracted steam:54.6Mpa back pressure:15KPa |
presure of steam inlet:8.83MP tem. of steam inlet: 435C. rated power:51MW back pressure:4.9KPa |
presure of steam inlet:16.7MP tem. of steam inlet: 538C. rated power:300MW pressure of extraction:1.1MP back pressure:10KPa |
10 | Performance (under standard condition) | heat rate:2467kcal/kw steam rate:4.16kg/kw |
heat rate:2206.5kcal/kw | heat rate:2215.3kcal/kw steam rate:4.16kg/kw |
steam rate:3.64kg/kw |