Gas-firing power plants is best known for it high thermal efficiency (highest thermal efficiency of natural gas-firing unit is 60%, compared to that of coal-firing power station, which is normally around 45%). Heat of exhaust discharged from gas turbine is collected in heat recovery system to heat water to steam and propel steam turbine.
Combined Cycle Power Generation, as the process is known, is the most developed sector of Runh Power, in which multitudinous experience has been acquired in more than two decades of work in design, construction and operation&maintenance.
Complete set of equipment available with Runh Power include following items (amendable upon your request)
1. Gas burning turbine
2. Heat recovering boiler
3. Steam turbine
4. Other auxiliary systems.
For commissioning Runh Power a project of power plant, following documents are required for the approval of foreign investment. With at least PPA and Feasibility Report in place, Runh Power is able to help the commissioner to secure private investment or loan from the state bank.
-1) Power Purchase Agreement (For independent power producers only)
-2) Feasibility report (In case that there is none, designers and engineers can be dispatched to compile one at the expense of commissioner.)
-3) Sovereign bonds (If sovereign bonds are acquired and the commissioner has 15 % of capital need for the project, Runh Power could start the project while engaging China Export & Credit Insurance Corporation)
-4) Construction Permit (optional)
-5) Fire permit (optional)
-6) Environmental impact assessment (optional)
-7) Land Lease (optional)
-8) Power Generation Power (optional)
-9) Other documents deemed helpful (optional)
Runh Power is dedicated to provide package service covering from end to end of a construction project of power plant.Services included in an EPC project unfolds in the following order, which also constitutes Runh Power's scope of service.
1.The Argumentation of Project
a. Verification of documents submitted
b. Audition of documents by the authority
c. Signing the contract
2. Engineering Design
a. Selection of a complete set of equipment according to the request or Runh Power's recommandation or the request from the commissioner.
b. Design of overall layout and all the sub-systems within the parameter of power plant.
c. Selection of personnel participating in the project
d. Submission of technical solution to the commissioner for review and approval.
3.Equipment Purchase& Transportation
a.Turbo Generator Set and its auxiliary systems (boiler, condensing water collector, deaerator, high pressure and low pressure superheaters, power distribution system. etc )
b. All the construction material, tools, spare parts and other necessities of the project
4. Civil Construction
a. All the civil construction work within the parameter of power plant
5. Operation & Maintenance
a. Operation of power plant (technical counseling) (Optional)
b.Regular maintenance and inspection (Optional)
c.Technical Training Program for Power Plant Personnel (Optional)
d.General Overhaul (Optional)
6. Installation & Testing
a.Installation & testing for all systems & equipment provided by Runh Power
b.Installation, testing & trail run of all systems of a power plant (Optional)
c.Installation, testing & trail run of entire power plant (Optional)
7. Supply of Spare Parts
a. Long-term supply of spare parts and other consumibles.(Optional)
Notice: EPS service, which refers to Engineering, Purchase & Supervision of Construction,is also available at your request, in case you prefer local construction contractor to international contractor.
Copy and paste superlinks below to your browser to view more products&services of Runh Power:
Integraed Turbine Island: http://runhpower.en.made-in-china.com/product/hbJmEuBKJdfU/China-Integrated-Turbine-Island.html
Condensing Steam Turbine: http://runhpower.en.made-in-china.com/product/tbEmABSCZwaZ/China-Condensing-Steam-Turbine-of-Runh-Power.html
Condensing & Extracting Steam Turbine: http://runhpower.en.made-in-china.com/product/GqxJRuXYTZAE/China-Condensing-Extracting-Steam-Turbine-of-Runh-Power.html
Back Pressure Steam Turbine: http://runhpower.en.made-in-china.com/product/lMJmfuSdJOGn/China-Back-Pressure-Steam-Turbine-of-Runh-Power.html
Spare parts of Steam turbine and power plant & maintenance service: http://runhpower.en.made-in-china.com/product/RKOmcohdCrpt/China-Quick-Wear-Parts-Washer-etc-for-Steam-Turbine-and-Power-Plant.html