Waste Heat Recovery System for Industrial Power Plant Factory

Product Details
Voltage: 1000kV
Generating Methods: Thermal Power Generation
Phase: Three Phase
Still deciding? Get samples of US$ 150000/Piece
Request Sample
Manufacturer/Factory, Trading Company, Group Corporation
Gold Member Since 2012

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Years of Export Experience
The export experience of the supplier is more than 10 years
Experienced Team
The supplier has 84 foreign trading staff(s) and 59 staff(s) with over 6 years of overseas trading experience
Exhibition Experience
The supplier had participated in offline trade shows, you can check the Audit Report for more information
Management Certification
The supplier has quality management system certification, including:
ISO9001:2015 certificate
ISO45001:2018 certificate
ISO14001
to see all verified strength labels (28)
  • Waste Heat Recovery System for Industrial Power Plant Factory
  • Waste Heat Recovery System for Industrial Power Plant Factory
  • Waste Heat Recovery System for Industrial Power Plant Factory
  • Waste Heat Recovery System for Industrial Power Plant Factory
  • Waste Heat Recovery System for Industrial Power Plant Factory
Find Similar Products
  • Overview
  • Product Description
  • Certifications
  • References
Overview

Basic Info.

Model NO.
Various
Maintenance
Available Upon Request
Operation
Available Upon Request
Transport Package
Negociable
Specification
25 to 100 MW
Trademark
Runh
Origin
Shandong Province
Production Capacity
One Years on Average

Product Description

Please click here >>>> Contact us for more factory prices,shipping and discounts.
Waste Heat Recovery System for Industrial Power Plant Factory
Product Description

Waste heat generated in the process of manufacturing cement or steel can be collected to generate steam and electricity. 


The heat recovery system developed by Runh Power, with its heat recovering steam turbine as the core component, has successfully helped dozens of manufacturers of cement, steel and pharmaceuticals maximizing their gains.
Waste Heat Recovery System for Industrial Power Plant Factory
Runh Power is dedicated to provide EPC service of heat recovery system to global commissioners, scope of work including:

- Engineering
- Equipment purchase
- Installation
- Commissioning
- Maintenance
Waste Heat Recovery System for Industrial Power Plant Factory

Runh Power is dedicated to provide package service covering from end to end of a construction project of power plant.Services included in an EPC project unfolds in the following order, which also constitutes Runh Power's scope of service.

1.The Argumentation of Project
   
a. Verification of documents submitted
    b. Audition of documents by the authority
    c. Signing the contract
2. Engineering Design
    a. Selection of a complete set of equipment according to the request or Runh Power's recommandation or the request from the commissioner.
    b. Design of overall layout and all the sub-systems within the parameter of power plant. 
    c. Selection of personnel participating in the project
    d. Submission of technical solution to the commissioner for review and approval.
3.Equipment Purchase& Transportation
    a.Turbo Generator Set and its auxiliary systems (boiler, condensing water collector, deaerator, high pressure and low pressure superheaters, power distribution system. etc )
    b. All the construction material, tools, spare parts and other necessities of the project
4. Civil Construction
    a. All the civil construction work within the parameter of power plant
5. Operation & Maintenance
    a. Operation of power plant (technical counseling) (Optional)
    b.Regular maintenance and inspection (Optional)
    c.Technical Training Program for Power Plant Personnel (Optional)
    d.General Overhaul (Optional)
6. Installation & Testing
    a.Installation & testing for all systems & equipment provided by Runh Power
    b.Installation, testing & trail run of all systems of a power plant (Optional)
    c.Installation, testing & trail run of entire power plant (Optional)
7. Supply of Spare Parts
    a. Long-term supply of spare parts and other consumibles.(Optional)

Notice: EPS service, which refers to Engineering, Purchase & Supervision of Construction,is also available at your request, in case you prefer local construction contractor to international contractor.

Waste Heat Recovery System for Industrial Power Plant Factory
Copy and paste superlinks below to your browser to view more products&services of Runh Power:

 
Integraed Turbine Island: http://runhpower.en.made-in-china.com/product/hbJmEuBKJdfU/China-Integrated-Turbine-Island.html

Circulating Fluidized Bed Boiler: http://runhpower.en.made-in-china.com/product/kBQmZVExRzRt/China-Coal-Firing-Circulating-Fluidized-Bed-Steam-Boiler-for-Power-Supply.html

Spare parts of Steam turbine and power plant & maintenance service:  http://runhpower.en.made-in-china.com/product/RKOmcohdCrpt/China-Quick-Wear-Parts-Washer-etc-for-Steam-Turbine-and-Power-Plant.html

Complete catalog of Runh Power's service and products: http://runhpower.en.made-in-china.com/product/DXOEPrMAqpUn/China-The-Catalog-of-Runh-Power-s-Service-Power-Plant-EPC-Contractor.html

Waste Heat Recovery System for Industrial Power Plant Factory
Certifications
Waste Heat Recovery System for Industrial Power Plant Factory
References
Waste Heat Recovery System for Industrial Power Plant Factory

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier