Boiler |
Pakistan 1x150t/h high pressure, high temperature vibrating grate type boiler |
Max. Continuous output: |
150t/h |
Rated steam pressure: |
9.81 Mpa |
Rated steam temperature: |
530 degree celicius |
Feed water temperature: |
180 degree celicius |
Exhaust Temperature: |
140 degree celicius |
Boiler Efficiency: |
91.8% |
Utilization hours: |
8000 h |
Water cooled vibrating grate:
1) Improved availability: |
The water cooled vibrating grate is one of the most reliable combustion grates in the world. The vibration inhibits the formation of large slag particles, which are common in straw and waste wood fuels. This makes the grate suitable for burning fuels with high slagging and sintering propensities. In addition, a vibrating grate requires less maintenance than a moving grate because it has fewer moving parts. |
2) Improved efficiency: |
The water cooled vibrating grate is fully automated and is one of the contributing factors to DP CleanTech achieving boiler efficiencies of 90-92%. This is due to the unique vibration movement and air distribution system, which optimizes the combustion process evenly across the grate. |
3) Improved fuel flexibility: |
The vibrating grate is one of few grates able to effectively accommodate mixtures of woody and herbaceous biomass fuel. |
Runh Power is an EPC contractor and complete equipment supplier, which has performed more than 100 international power projects in Turkey, Ukraine, India, etc. With 20 years' development, now we provide EPC/turnkey service and complete set of equipment such as STG, BTG, BOP, etc for all kinds of power projects such as coal fired power plant, biomass power plant, CCPP, waste heat power plant, new energy power plant, etc. Our service and products are highly appreciated by the owner. And we mainly own the following advantages:
1 Professional design institute:
We own independent design institute, about 50 experienced and?professional?engineers for all systems of power plant in our design institute, they could make proposals for power projects of various sizes. ?
2 Cost effective equipments:
We establish cooperative relationship with domestic well-known OEMs, their products employs the most advanced ?technology and their quality could be guaranteed. And they provide equipments for us with a relatively competitive price. Besides, we have undertaken 28 international power projects which also could prove that our products and services are very competitive.
3 Competitive delivery time:
Time is very important, especially for power projects and we could guarantee and provide competitive delivery time. In order to achieve this goal, we mainly have 4 steps:
Step 1: Design, our design institute could guarantee the design schedule;
Step 2: Manufacturing, our cooperative OEMs will arrange our order preferentially;
Step 3: Local branch, we have 4 local branch in domestic, and they will manufacture the manufacturing schedule and quality of our orders.
Step 4: Rich experienced and professional team, our team have accumulated rich experience and they could solve the problems and risks and avoild potential delays in delivery.
4 After-sales service;
Many owners worry about this, especially for international power projects and we provide complete after sales service to reduce your risks such as one-to-one service system; periodic visiting; customer documents; global maintenance team, etc.
5. Second hand equipment
We own abundant secondhant equipment which are under quite good condition, their price is much cheaper and the construction period could be shorter. We provide all round service for secondhand equipments such as?Renovation & equipment retrofit ,Re-location of power plant, Unit capacity upgrade, Performance upgrade and energy saving proposal, System upgrade (Instrumentation, energy efficient electrics, etc.) And what's more, we provide the same guarantee period compared with new equipments.
6. Reference list